0 - General Updates

Newsletter 8: Crosskeys Roundabout Works

Posted on
Highways Improvements

Newsletter #8 from highways contractors at Crosskeys Roundabout. Progress since 2nd August During the last two weeks we have installed the drainage, constructed the new widened carriageway and the shared use cycleway/footway in the verge outside M&S on the A38 towards Stroud/Whitminster. The footway/cycleway outside McDonalds has been constructed, ready for surfacing. We have also […]

0 - General Updates

Newsletter 6: Crosskeys Roundabout Works

Posted on
Highways Improvements

Newsletter #6 from highways contractors at Crosskeys Roundabout. Progress since 4th July During the last two weeks we have continued to work near the retaining wall along the A38 approach from the M5 (previously the B4008) to install the surface of the new widened carriageway. We have also filled the footway ready for the surface […]

0 - General Updates

Newsletter 4: Crosskeys Roundabout Works

Posted on
Highways Improvements

Newsletter #4 from highways contractors at Crosskeys Roundabout. Progress since 7th June During the last two weeks we have installed the retaining wall and drainage along the A38 approach from the M5 (previously the B4008). We’ve completed the temporary surface on the inside lane of the roundabout and installed drains near the site of the […]

0 - General Updates

Newsletter 3: Crosskeys Roundabout Works

Posted on
Highways Improvements

Newsletter #3 from highways contractors at Crosskeys Roundabout. A38 Cross Keys Roundabout Improvements Bulletin 3 – 7th June 2019 Progress since 24th May Drainage pipes and cable ducts have been installed within the roundabout island and kerbs have been set along the new line of the roundabout. Preparations for the new carriageway surface are underway. […]

0 - General Updates

Newsletter 2: Crosskeys Roundabout Works

Posted on
Highways Improvements

Newsletter #2 from highways contractors at Crosskeys Roundabout. A38 Cross Keys Roundabout Improvements Bulletin 2 – 24 May 2019 Progress since 13 May We set up our traffic management around the island with a new solid white line and cones around the roundabout and barriers along the approach from the M5 (previously the B4008). We […]

0 - General Updates

Traffic Issues on Marconi Drive

Posted on
Roadworks

HGRA is aware of the issues with the roadworks on Marconi Drive, traffic lights and passing through with parked cars and vans today. BT and their contractors are installing new chambers in the road / pavement to connect the new homes being built on Marconi Drive. The roadworks are planned to last until May 1st. […]

0 - General Updates

Crosskeys Roundabout: Overnight Closures Between April & September 2019

Posted on
Highways Improvements

Works on Crosskeys Roundabout improvements will be starting soon and you should bear in mind that this will involve overnight closures on a limited number of nights between April and September.  Closures commence rather early at 7pm, so bear this in mind if travelling these routes.   The full announcement from Highways below. Crosskeys Roundabout This […]

4 - Highways

Highways Issues – Marconi Drive Meeting

Posted on

  Sorry, we can only show this content to members.  Please register to join. If you have already have an account for the website and are having issues logging-in or the site is not working, please drop us a line so that we can sort it out. REGISTER to join us Already a member?  LOG-IN […]